eXtrem makeover on my kitchen!
After such a long time planing and dreaming of a new kitchen, the time finally came!
Two weeks of none-stop working every time I had a spare minute, the kitchen is as good as finished!
And it didn’t ruined me either. The total cost: Just over 30 000… 🙂
And then some pictures.
Left one: How it look after taking down everything.
Middle one: on my way.
Right one: The finish!
Left one: How it look after taking down everything.
Right one: The finish!